Industrial type scaffolding rental, installation and dismantling services were provided in line with the needs of Soma Kolin Thermal Power Plant, which is among the top 20 thermal power plants in Turkey operating in the Soma district of Manisa, during the planned maintenance stops in 2020, 2021, 2022 and 2023. Scaffolding was installed and dismantled in order to carry out the necessary maintenance and repairs in the internal and external environments of various equipment such as boilers, absorbers, etc. in the facility.

  • JOB VOLUME
    30.000 m³

  • JOB STATUS
    CONTINUED1

  • SECTOR
    TERMİK SANTRAL